| 71441 |
ADV_395_125 |
Heavy Vehicle Factory
|
The Sr.General Manager,
Avadi
Avadi
Avadi, Tamil Nadu
600054
|
| Name |
Code |
Quantity |
Approx Value |
Select |
Chucks
Description
As per specification
Specification
As per specification
Testing / Inspection Facility
|
|
|
|
|
Hydraulic Cylinders
Description
As per specification
Specification
As per specification
Testing / Inspection Facility
|
|
|
|
|
Accessories for Hydraulic Cylinders
Description
As per specification
Specification
As per specification
Testing / Inspection Facility
|
|
|
|
|
Machining of Precision Components
Description
As per specification
Specification
As per specification
Testing / Inspection Facility
|
|
|
|
|
Plain Press Components up to 100 Ton Capacity
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Machined Components
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Jigs and Fixtures [Medium]
Description
As per specification / à ¤µà ¤¿à ¤¨à ¤¿à ¤°à ¥Âà ¤¦à ¥‡à ¤¶ à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per specification / à ¤µà ¤¿à ¤¨à ¤¿à ¤°à ¥Âà ¤¦à ¥‡à ¤¶ à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Special Purpose Machines
Description
As per specification / à ¤µà ¤¿à ¤¨à ¤¿à ¤°à ¥Âà ¤¦à ¥‡à ¤¶ à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per specification / à ¤µà ¤¿à ¤¨à ¤¿à ¤°à ¥Âà ¤¦à ¥‡à ¤¶ à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Light Duty Hydraulic Press
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Assembly Fuel Lines and Connection
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Metallic Bush
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Oil Rings
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Oil Seal
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Sheet Metal Works
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Fabrication
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Simple Press Components
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Precision Components
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Sheet Metal Works
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Fabrication
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Centrifugal Filter
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
|
| 71442 |
ADV_259_138 |
Grey Iron Foundry
|
The General Manager,
Jabalpur
Jabalpur
Jabalpur, Madhya Pradesh
482009
|
| Name |
Code |
Quantity |
Approx Value |
Select |
Foundy Pig Iron.
Description
As Per Specification & Requirement
Specification
As Per Specification & Requirement
Testing / Inspection Facility
|
|
|
|
|
Steel Billet.
Description
As Per Specification & Requirement
Specification
As Per Specification & Requirement
Testing / Inspection Facility
|
|
|
|
|
TMT Bars.
Description
As Per Specification & Requirement
Specification
As Per Specification & Requirement
Testing / Inspection Facility
|
|
|
|
|
Bridging System
Description
RDE/ENGR/SPEC 220, 227, 228, 229, 230, 123(a), 184
Specification
RDE/ENGR/SPEC 220, 227, 228, 229, 230, 123(a), 184
Testing / Inspection Facility
|
|
|
|
|
All Types of Synthetic Enamel Paints and Thiners for Industrial use.
Description
As Per Specification & Requirement
Specification
As Per Specification & Requirement
Testing / Inspection Facility
|
|
|
|
|
Fuel Filter Element/Assembly
Description
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
End Pack Assembly
Description
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Sheet Metal Components
Description
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Washers
Description
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Seal Rings
Description
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Shim [Bi-metal Ring]
Description
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
|
| 71443 |
ADV_4_108 |
Ordnance Clothing Factory Shahjahanpur
|
The General Manager,
Shahjahanpur
Shahjahanpur
Shahjahanpur, Uttar Pradesh
242001
|
| Name |
Code |
Quantity |
Approx Value |
Select |
BATTING POLYESTER 200 GSM 150cms
Description
As Per Requirement & Specification
Specification
As Per Requirement & Specification
Testing / Inspection Facility
|
|
|
|
|
|
| 71444 |
ADV_903_131 |
Vehicle Factory Jabalpur
|
The Sr.General Manager,
Jabalpore
Jabalpore
Madhya Pradesh
482009
|
| Name |
Code |
Quantity |
Approx Value |
Select |
U Bolt with Nut
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
fForgings Reverse gear main shaft, Coupling Flange LPTA
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
Forgings Over drive gear on main shaft, 3rd speed counter shaft LPTA,
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
Forgings 1st speed, 2nd speed, 3rd speed, 4th speed Gear main shaft LPTA,
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
Structural & Constructional Steel
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
Round (Dia. 80 to 180), Flat, Square, Hex, Blanks of Non Alloy & Alloy Steel, Tool Steel, S.S,
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
2 KL Water Bowser
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
Steel Balls dor Bearings of size 4.763 mm to 25.4 mm Grade 10 to 28
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
LDPE Sheet for peak various
Description
As Per Specification & Requirement
Specification
As Per Specification & Requirement
Testing / Inspection Facility
|
|
|
|
|
Tape adhesive brown and Tape self adhesive transparent
Description
As Per Specification & Requirement
Specification
As Per Specification & Requirement
Testing / Inspection Facility
|
|
|
|
|
Tape Elastic 25MM WIDE
Description
TAPE ELASTIC 25MM WIDE WHITE.
SPECIFICATION IS: 9686-1980 AMDT No 1 REAFFIRMED 2012
Specification
TAPE ELASTIC 25MM WIDE WHITE.
SPECIFICATION IS: 9686-1980 AMDT No 1 REAFFIRMED 2012
Testing / Inspection Facility
|
21 |
Metre |
|
|
HDPE Bag Various
Description
As Per Specification & Requirement
Specification
As Per Specification & Requirement
Testing / Inspection Facility
|
|
|
|
|
Buckle Plastic Various
Description
As Per Specification & Requirement
Specification
As Per Specification & Requirement
Testing / Inspection Facility
|
|
|
|
|
Button IAF small and large with nickel chrome plated
Description
As Per Specification & Requirement
Specification
As Per Specification & Requirement
Testing / Inspection Facility
|
|
|
|
|
Snap fastener 7/7 in two parts top nickel plated
Description
As Per Specification & Requirement
Specification
As Per Specification & Requirement
Testing / Inspection Facility
|
|
|
|
|
Ductil Iron Pipe.
Description
As Per Specification & Requirement
Specification
As Per Specification & Requirement
Testing / Inspection Facility
|
|
|
|
|
Sub Assemblies
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Assemblies
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
|
| 71445 |
ADV_752_132 |
Field Gun Factory Kanpur
|
The General Manager,
Kanpur
Kanpur
Uttar Pradesh
208009
|
| Name |
Code |
Quantity |
Approx Value |
Select |
ALL TYPES OF FORGINGS FOR VARIOUS COMPONENTS OF ORDNANCE/WEAPONS
Description
AS PER FGK DRG./SPECIFICATION
Specification
AS PER FGK DRG./SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
CATCH HAMMER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
CATCH BARREL
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
BARREL BLANK
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
SPRING CATCH BARREL
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
LIGHT/MEDIUM/HEAVY MACHINING AND FABRICATION WORKS
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
DIESEL LOCOMOTIVES SPARES
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
PNEUMATIC TOOLS
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
SPARE FOR AIR/GAS/REFRIGERATION COMPRESSARS
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
CLEANING KIT
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
REVOLVER CLIP OF BUFF
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
HGP & MDV ball pin bushes for Automotive applications
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
All types of King pin, U Bolts, Shakle pin, Striker pin, Selector spindle, Pin long & short,
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
High Precision Machined Components
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Raw Material Ferrous
Description
As per ISS, BSS, GOST, AISI, ASTMA, SAE & DIN Standards
Specification
As per ISS, BSS, GOST, AISI, ASTMA, SAE & DIN Standards
Testing / Inspection Facility
|
|
|
|
|
Press Components
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Fabrication
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Precision Machined Components
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Starter Generator
Description
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Specification
As per drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤…à ¤¨à ¥Âà ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
|
| 71446 |
ADV_44_113 |
Ordnance Factory Khamaria
|
The Cheif General Manager
Khamaria
Khamaria
Madhya Pradesh
482005
|
| Name |
Code |
Quantity |
Approx Value |
Select |
BASE FOR HEAT-651
Description
DRG.NO. F1321-309510-C (WHITE CONDITION ONLY) DC NO. 35561-A DT. 23/8/93
Specification
DRG.NO. F1321-309510-C (WHITE CONDITION ONLY) DC NO. 35561-A DT. 23/8/93
Testing / Inspection Facility
|
|
|
|
|
MOULD FIXTURE
Description
DRG.NO. KhFQ-330875
Specification
DRG.NO. KhFQ-330875
Testing / Inspection Facility
|
|
|
|
|
MULTI MOULD FIXTURE WEIGHT= 92+/-2 GM
Description
DRG.NO. KhFQ-330875a
Specification
DRG.NO. KhFQ-330875a
Testing / Inspection Facility
|
|
|
|
|
CRATE WOOD 12-A
Description
SPECN.:IA-948(ak) DC (I) 36868-A, AIDE MEMOIRE W/4 DRG.PT.NO. ISV-483-A DC NO. 36999-A DT. 02/02/2005.
Specification
SPECN.:IA-948(ak) DC (I) 36868-A, AIDE MEMOIRE W/4 DRG.PT.NO. ISV-483-A DC NO. 36999-A DT. 02/02/2005.
Testing / Inspection Facility
|
|
|
|
|
Carbide Tools
Description
As per specification
Specification
As per specification
Testing / Inspection Facility
|
|
|
|
|
Thyristor & All Industrial Automation Products
Description
As per specification
Specification
As per specification
Testing / Inspection Facility
|
|
|
|
|
Speed Sensors
Description
As per specification
Specification
As per specification
Testing / Inspection Facility
|
|
|
|
|
Rotary Encoder
Description
As per specification
Specification
As per specification
Testing / Inspection Facility
|
|
|
|
|
SMPS
Description
As per specification
Specification
As per specification
Testing / Inspection Facility
|
|
|
|
|
Photo Electric Sensors
Description
As per spepcification
Specification
As per spepcification
Testing / Inspection Facility
|
|
|
|
|
Proximity Sensors
Description
As per specification
Specification
As per specification
Testing / Inspection Facility
|
|
|
|
|
|
|