| 74001 |
ADV_619_128 |
Ordnance Factory Tiruchirapalli
|
The General Manager,
Tiruchirapalli
Tiruchirapalli
Tamil Nadu
620016
|
|
| 74002 |
ADV_743_129 |
Ordnance Factory Chanda
|
The Cheif General Manager
Chanda
Chanda
Maharashtra
442501
|
|
| 74003 |
ADV_395_125 |
Heavy Vehicle Factory
|
The Sr.General Manager,
Avadi
Avadi
Avadi, Tamil Nadu
600054
|
|
| 74004 |
ADV_147_111 |
Ordnance Factory Ambernath
|
The Sr.General Manager,
Ambarnath
Ambarnath
Maharashtra
421502
|
| Name |
Code |
Quantity |
Approx Value |
Select |
ERECTION / FABRICATION & SHIFTING OF PLANT & MACHINARIES.
Description
AS PER OUR REQUIREMENT.
Specification
AS PER OUR REQUIREMENT.
Testing / Inspection Facility
|
|
|
|
|
FIBRE BOARD PKG BOX SCC30
Description
PACKING BOX (CORRUGATED FIBRE BOARD) FOR 30 MM SARATH STEEL CARTG.CASE
Specification
IS:2771: (PART 1):1990 REV.NO.2 REAFFIRMED IN 2013
Drawing no.
OFA DRG.NO SCC30/SK/0200/D SHT 1/2 DTD.09.11.02 AMENDED UPTO 14.12.2016. AND SCC30/SK/0200 SHT 2/2 DTD.20.12.2006
Testing / Inspection Facility
|
14 |
Number |
|
|
|
| 74005 |
ADV_496_120 |
Ordnance Clothing Factory Avadi
|
The General Manager,
Avadi
Avadi
Avadi, Tamil Nadu
600054
|
|
| 74006 |
ADV_44_113 |
Ordnance Factory Khamaria
|
The Cheif General Manager
Khamaria
Khamaria
Madhya Pradesh
482005
|
| Name |
Code |
Quantity |
Approx Value |
Select |
SPACER FOR HEAT-551
Description
DRG.NO. TRD-2-2-2273
Specification
DRG.NO. TRD-2-2-2273
Testing / Inspection Facility
|
|
|
|
|
SET OF 3 COMPONENTS FOR BOOSTER
Description
DRG.NO. TRD-2-2-2277, TRD-1-2-2278, TRD-1-2-2279
Specification
DRG.NO. TRD-2-2-2277, TRD-1-2-2278, TRD-1-2-2279
Testing / Inspection Facility
|
|
|
|
|
SET OF 8 COMPONENTS FOR DELAY UNIT
Description
DRG.NO. TRD-1-2-2231, TRD-1-2-2232, TRD-1-2-2233, TRD-2-2-2227, TRD-1-2-2228, TRD-1-2-2229, TRD-1-2-2230, TRD-1-2-2253
Specification
DRG.NO. TRD-1-2-2231, TRD-1-2-2232, TRD-1-2-2233, TRD-2-2-2227, TRD-1-2-2228, TRD-1-2-2229, TRD-1-2-2230, TRD-1-2-2253
Testing / Inspection Facility
|
|
|
|
|
OUTSOURCING & FABRICATION CONTRACT.
Description
AS PER SPECIFICATION / REQUIREMENT
Specification
AS PER SPECIFICATION / REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
WELDING SPARES & ACCESSORIES.
Description
AS PER SPECIFICATION / REQUIREMENT
Specification
AS PER SPECIFICATION / REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
WELDING CONSUMABLES.
Description
AS PER SPECIFICATION / REQUIREMENT
Specification
AS PER SPECIFICATION / REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
Open Die Forgings
Description
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤•à ¥‡ à ¤…à ¤¨à ¥‚à ¤¸à ¤¾à ¤°
Specification
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤•à ¥‡ à ¤…à ¤¨à ¥‚à ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Hollow Shafts
Description
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤•à ¥‡ à ¤…à ¤¨à ¥‚à ¤¸à ¤¾à ¤°
Specification
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤•à ¥‡ à ¤…à ¤¨à ¥‚à ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Tube Steel
Description
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤•à ¥‡ à ¤…à ¤¨à ¥‚à ¤¸à ¤¾à ¤°
Specification
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤•à ¥‡ à ¤…à ¤¨à ¥‚à ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Flanges [All Types]
Description
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤•à ¥‡ à ¤…à ¤¨à ¥‚à ¤¸à ¤¾à ¤°
Specification
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤•à ¥‡ à ¤…à ¤¨à ¥‚à ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
Seamless Ring
Description
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤•à ¥‡ à ¤…à ¤¨à ¥‚à ¤¸à ¤¾à ¤°
Specification
As per Drawing / à ¤°à ¥‡à ¤–à ¤¾à ¤šà ¤¿à ¤¤à ¥Âà ¤° à ¤•à ¥‡ à ¤…à ¤¨à ¥‚à ¤¸à ¤¾à ¤°
Testing / Inspection Facility
|
|
|
|
|
SUPPLY OF MACHINE PARTS.
Description
AS PER SPECIFICATION / REQUIREMENT
Specification
AS PER SPECIFICATION / REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
FABRICATION WORK.
Description
AS PER SPECIFICATION / REQUIREMENT
Specification
AS PER SPECIFICATION / REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
BUILDING MAINTENANCE MATERIAL.
Description
AS PER SPECIFICATION / REQUIREMENT
Specification
AS PER SPECIFICATION / REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
SHEET /PLATE/PIPE/TUBE/WIRE/ROD ETC OF INCONEL NICKLE ALLOYS, HASTELLOY, NICKLE, TITANIUM GRADE & CO
Description
AS PER SPECIFICATION / REQUIREMENT
Specification
AS PER SPECIFICATION / REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
ALL TYPES OF M.S. , S.S , ENGG, MECHANICAL & FABRICATION WORKS.
Description
AS PER OUR REQUIREMENT.
Specification
AS PER OUR REQUIREMENT.
Testing / Inspection Facility
|
|
|
|
|
|
| 74007 |
ADV_32_114 |
Ordnance Factory Dehradun
|
The General Manager,
Dehra Dun
Dehra Dun
Uttaranchal
248008
|
|
| 74008 |
ADV_294_119 |
Machine Tool Proto Type Factory
|
The General Manager,
Ambarnath
Ambarnath
Ambernath, Maharashtra
421502
|
| Name |
Code |
Quantity |
Approx Value |
Select |
Forgings for Intermediate Gear Spindle for T90 & all types of Forgings for IGB
Description
As per Drg. No 172-45-033/F
Specification
As per Drg. No 172-45-033/F
Testing / Inspection Facility
|
|
|
|
|
Semifinish Barrel for Revolver MK-III
Description
As per Drg. No. RV-32-MK-III-0301-2
Specification
As per Drg. No. RV-32-MK-III-0301-2
Testing / Inspection Facility
|
|
|
|
|
Semifinish Barrel for Revolver MK-III
Description
As per Drg. No. RV-32-MK-III-0301-2
Specification
As per Drg. No. RV-32-MK-III-0301-2
Testing / Inspection Facility
|
|
|
|
|
Bush type Flexible Coupling
Description
As per Drawings / Specifications / Requirements
Specification
As per Drawings / Specifications / Requirements
Testing / Inspection Facility
|
|
|
|
|
Timing Belts
Description
As per Drawings / Specifications / Requirements
Specification
As per Drawings / Specifications / Requirements
Testing / Inspection Facility
|
|
|
|
|
V-Belts Fenner Make
Description
As per Drawings / Specification / Requirements
Specification
As per Drawings / Specification / Requirements
Testing / Inspection Facility
|
|
|
|
|
|
| 74009 |
ADV_106_102 |
Ordnance Equipment Factory
|
The General Manager,
Kanpur
Kanpur
Kanpur, Uttar Pradesh
208001
|
|
| 74010 |
ADV_206_136 |
Opto Electronic Factory
|
Dehradun
Dehradun
Dehradun
Dehradun, Uttaranchal
248008
|
| Name |
Code |
Quantity |
Approx Value |
Select |
Hydraulic System
Description
Hydraulic Power Pack- Hydraulic Power Packs for application at RIG
Specification
Hydraulic Power Pack- Hydraulic Power Packs for application at RIG
Testing / Inspection Facility
|
|
|
|
|
Precision Machine
Description
Turning, Milling, Darilling, Tapping - Capable to do precision machining with high accuracy ( Within 10 Micron tolerance)
Specification
Turning, Milling, Darilling, Tapping - Capable to do precision machining with high accuracy ( Within 10 Micron tolerance)
Testing / Inspection Facility
|
|
|
|
|
General Engineering
Description
1.Turning- Dia 730 mm Length 1070 mm (Max) 2.Milling- X- 1300, Y- 650, Z- 625 (Max) 3. Drilling - Dia- 63 mm (Max) 4.Tapping - (M 24x3) 5. Sheet Metal Works- Press Capacity 100 Ton
Specification
1.Turning- Dia 730 mm Length 1070 mm (Max) 2.Milling- X- 1300, Y- 650, Z- 625 (Max) 3. Drilling - Dia- 63 mm (Max) 4.Tapping - (M 24x3) 5. Sheet Metal Works- Press Capacity 100 Ton
Testing / Inspection Facility
|
|
|
|
|
Manufacturing of Various types of Alluminium Components except Sheet Metal works
Testing / Inspection Facility
|
|
|
|
|
Manufacturing of Pressure Die Castings (Al.)
Testing / Inspection Facility
|
|
|
|
|
Manufacturing of various types of Al. Components except sheet metal works
Testing / Inspection Facility
|
|
|
|
|
Manufacturing of Pressure Die Castings (Al.)
Testing / Inspection Facility
|
|
|
|
|
|
|