Items open for Registration

Search

Reset
No Advertisement No. Factory Location Items
75441 ADV_44_113 Ordnance Factory Khamaria The Cheif General Manager
Khamaria
Khamaria
Madhya Pradesh
482005
Name Code Quantity Approx Value Select
CRATE WOOD 13-A
Description
IA-948 (ak),DRG.PT.NO.ISV-484-A
Specification
IA-948 (ak),DRG.PT.NO.ISV-484-A
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CRATE WOOD 12-A
Description
IA-948 (ak),DRG.PT.NO.ISV-483-A
Specification
IA-948 (ak),DRG.PT.NO.ISV-483-A
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
75442 ADV_743_129 Ordnance Factory Chanda The Cheif General Manager
Chanda
Chanda
Maharashtra
442501
Name Code Quantity Approx Value Select
0832260908 FOIL TIN / LEAD 63MM
Description
SPECN NO. JSS 9535 - 06
Specification
SPECN NO. JSS 9535 - 06
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
0800390677- STRIP LEAD CHEMICAL PURPOSE SIZE 35MM WIDE x .08MM THICK
Description
SPECN NO. IS: 405-1992 (PART I)
Specification
SPECN NO. IS: 405-1992 (PART I)
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
0800110125-LEAD WIRE 1.25MM +/- 0.25 MM DAI
Description
SPECN. NO. GOST 5655 -67
Specification
SPECN. NO. GOST 5655 -67
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SHELL BODY BLANK (INTERNAL OPERATION)
Description
OFK. DRG.NO. TRD- 839 (K)
Specification
OFK. DRG.NO. TRD- 839 (K)
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
BOX WOODEN CARTG.125MM +CHARGE
Description
DRG.NO.118406 & CATALOG 11-711XXX WITHOUT CONTAINER
Specification
DRG.NO.118406 & CATALOG 11-711XXX WITHOUT CONTAINER
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
75443 ADV_752_132 Field Gun Factory Kanpur The General Manager,
Kanpur
Kanpur
Uttar Pradesh
208009
Name Code Quantity Approx Value Select
INVESTMENT CASTING FROM 02 GRAMS TO 20 KGS IN ANNEALED, NORMALISED, HARDENING & TEMPRING CONDITION O
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
INVESTMENT CASTING FROM 02 GRAMS TO 20 KGS IN ANNEALED, NORMALISED, HARDENING & TEMPRING CONDITION O
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
INVESTMENT CASTING FROM 02 GRAMS TO 20 KGS IN ANNEALED, NORMALISED, HARDENING & TEMPRING CONDITION O
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
75444 ADV_4_108 Ordnance Clothing Factory Shahjahanpur The General Manager,
Shahjahanpur
Shahjahanpur
Shahjahanpur, Uttar Pradesh
242001
Name Code Quantity Approx Value Select
Fastener Hooks Loop Tape all sizes and colours
Description
synthetic hook & loop fastener various sizes and colours specification IS 8156 2014 3rd REV except that the peel strength shall be 250g/cm min and sheer strength 900 g/cm2 min pantone shade No 19 5917 TCX green with best trade quality
Specification
synthetic hook & loop fastener various sizes and colours specification IS 8156 2014 3rd REV except that the peel strength shall be 250g/cm min and sheer strength 900 g/cm2 min pantone shade No 19 5917 TCX green with best trade quality
Drawing no.
Manufacturing Technology
  • as per attached file
Testing / Inspection Facility
  • as per attached file
21 Metre
Plastic Tips
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Plastic Stopper all sizes
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Button IAF all sizes
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Metal Hook & Metal clip
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Eyelet Steel
Description
EYELET STEEL EYELET STEEL SCHEDULE NO. DMSRDE/LE2/2000/EYELET
Specification
EYELET STEEL EYELET STEEL SCHEDULE NO. DMSRDE/LE2/2000/EYELET
Drawing no.
Manufacturing Technology
  • AS PER ATTACHED FILE
Testing / Inspection Facility
  • AS PER ATTACHED FILE
21 Number
Snap Fastener Top 7 by 7 and Bottom 7 by 7 in Four Parts Cap of Top Covered with Dark Brown Sheeting
Description
Snap Fastener Top 7/7 & Bottom 7/7 in Four Parts (Cap of Top Covered with Dark Brown Sheeting) Specification:- IS:4741-1968 (reaffirmed 2008) Unit – set contains 10 set Snap fastener 7/7 bottom in two parts and 12 set Snap fastener 7/7 Top in two parts are equal to 01 set
Specification
Snap Fastener Top 7/7 & Bottom 7/7 in Four Parts (Cap of Top Covered with Dark Brown Sheeting) Specification:- IS:4741-1968 (reaffirmed 2008) Unit – set contains 10 set Snap fastener 7/7 bottom in two parts and 12 set Snap fastener 7/7 Top in two parts are equal to 01 set
Drawing no.
Manufacturing Technology
  • as per attached list (Manufacturing Technology Files )
Testing / Inspection Facility
  • as per attached list (Testing / Inspection Facility Files )
21 Set
Eyelet Aluminium
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Press Button Titch Type Black
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Aluminum wire PVC coated
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Buckram Canvas tailors
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Self Sealing Polythene Bags all sizes
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Polythene Bags all sizes
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Straping Seal Steel for all sizes
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Polypropylene Straping all size-12,16,19mm
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Naphthalene Balls
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Tape Elastic/Cord Elastic
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Fused Coller/ Straps
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Shoulder Straps
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Shoulder Pad
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Cotton Lap
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Button Plastic Various
Description
As per Requirements & Specifications
Specification
As per Requirements & Specifications
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CYLINDER SUB ASSEMBLY
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SPRING MAIN
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SPRING CATCH BARREL
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PIN LEVER SPRING MAIN
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PIN EXTRACTOR
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
LEVER EXTRACTOR
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
BLANK FOR BARREL
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
LEVER CAM
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
HAMMER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
TRIGGER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PLATE BODY
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CAM CYLINDER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SHIELD
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
EXTRACTOR
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
LEVER SPRING MAIN
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
STOP CYLINDER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CATCH BARREL
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PAWL
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SAFETY
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SWIVEL HAMMER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CATCH HAMMER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CATCH TRIGGER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PIN FIXING BARREL
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PIN EXTRACTOR
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PIN CATCH TRIGGER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PIN CATCH PIN SWIVEL HAMMER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
NUT EXTRACTOR
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
LEVER AUXILLARY
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
BUSH STUD TRIGGER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CYLINDER SUB ASSEMBLY
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SPRING MAIN
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SPRING CATCH BARREL
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PIN LEVER SPRING MAIN
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PIN EXTRACTOR
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
LEVER EXTRACTOR
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
BLANK FOR BARREL
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
LEVER CAM
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
HAMMER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
TRIGGER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PLATE BODY
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CAM CYLINDER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SHIELD
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
EXTRACTOR
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
LEVER SPRING MAIN
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
STOP CYLINDER
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CATCH BARREL
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PAWL
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SAFETY
Description
AS PER DRG. & SPECIFICATION
Specification
AS PER DRG. & SPECIFICATION
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Proceed