| Name |
Code |
Quantity |
Approx Value |
Select |
Fabrication & Machining work for Army Load body componentss
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
5th Cross member, Engine Cross member, Assy. Cross tube,
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
All type of Fabricated components such as Tail Lamp BKT. Jarrican carrier,
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
MACHINING OF PLUNGER FOR HEAT- 551
Description
DRG.NO. TRD-22-2250 BLANK TO DRG.NO. TRD- 12-2293.
Specification
DRG.NO. TRD-22-2250 BLANK TO DRG.NO. TRD- 12-2293.
Testing / Inspection Facility
|
|
|
|
|
MACHINING OF AFT CLOSURE FOR HEAT- 551
Description
DRG.NO. TRD-32-2241 BLANK TO DRG.NO. TRD- 22-2294.
Specification
DRG.NO. TRD-32-2241 BLANK TO DRG.NO. TRD- 22-2294.
Testing / Inspection Facility
|
|
|
|
|
Fabricated items such as Load Body complete, Assy. Bumper, Rear Towing Hook
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
PLUG PROTECTIVE DUST & MOISTURE FOR 30MM CANNON
Testing / Inspection Facility
|
|
|
|
|
VALVE FOR 30MM CANNON
Testing / Inspection Facility
|
|
|
|
|
PLUG PROTECTIVE DUST & MOISTURE FOR 30MM CANNON
Testing / Inspection Facility
|
|
|
|
|
VALVE FOR 30MM CANNON
Testing / Inspection Facility
|
|
|
|
|
& Radiator mtg. Frame, Jerrican carrier, Assy. Bumper, 5th Cross member, Air tank assy.
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
5th Cross member, Engine Cross member
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
Clutch Rocker Shaft, Drag link (Straight & Threaded one) to part no. 645-04-1106-1/A
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
Carbon Steel Casting Weight 5 Kg to 200 Kg
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
SG Iron casting weight 10 Kg to 100 Kg, Grey Iron casting 10 Kg to 1M Ton,
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
PLUG PROTECTIVE DUST & MOISTURE FOR 30MM CANNON
Testing / Inspection Facility
|
|
|
|
|
VALVE FOR 30MM CANNON
Testing / Inspection Facility
|
|
|
|
|
Hydraulic Jack up to 100 Ton
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
Batteries 12 V up to 190 Ah
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
Casting of Phosphorous Bronze tube for LPTA
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
Composite Armour LHS/RHS asper Drg. no. 645-15-1-1 to 15/B
Description
As per specification/ Drg.
Specification
As per specification/ Drg.
Testing / Inspection Facility
|
|
|
|
|
AL.STOP FOR 125MM HE IN F.C
Description
SK.NO.1097 OF DRG.NO.4-024610.
Specification
SK.NO.1097 OF DRG.NO.4-024610.
Testing / Inspection Facility
|
|
|
|
|
MAGAZINE FOR FUZE 162 IN F.C
Description
DRG.PT.NO.IQX-12
Specification
DRG.PT.NO.IQX-12
Testing / Inspection Facility
|
|
|
|
|
STRIKER FOR FUZE 162 IN F.C
Description
DR.PT.NO.QX-331 DC.NO.36887-A DT.08-03-2003.
Specification
DR.PT.NO.QX-331 DC.NO.36887-A DT.08-03-2003.
Testing / Inspection Facility
|
|
|
|
|
STOP PIN FOR FUZE 162 IN F.C
Description
OFDCDRG.NO.SK- 2542
Specification
OFDCDRG.NO.SK- 2542
Testing / Inspection Facility
|
|
|
|
|
STEM OF PLUG-I & II FOR 51MM MOTAR BOMB
Description
DRG.NO.ITV-166 DC.NO.36120-A DT.24.05.96
Specification
DRG.NO.ITV-166 DC.NO.36120-A DT.24.05.96
Testing / Inspection Facility
|
|
|
|
|
CONTAINER FOR CD-14,11LB,MK-1(EMPTY)
Description
DRG.NO.TX-18A, DC.37080-A 5
Specification
DRG.NO.TX-18A, DC.37080-A 5
Testing / Inspection Facility
|
|
|
|
|
SEMI RING FOR 125MM HEAT IN F.C
Description
DRG.NO.4-025998 DET.NO.076, DC.NO.35357-A DT.30.07.92
Specification
DRG.NO.4-025998 DET.NO.076, DC.NO.35357-A DT.30.07.92
Testing / Inspection Facility
|
|
|
|
|
TRACER NUT FOR 125MM HEAT IN F.C
Description
DRG.NO.4-025998,DET.NO.036, DC.NO.37003-A DT.11.03.05
Specification
DRG.NO.4-025998,DET.NO.036, DC.NO.37003-A DT.11.03.05
Testing / Inspection Facility
|
|
|
|
|
AXLE PIN FOR 125MM HEAT IN F.C
Description
DRG.NO.4-025998 DET.NO.025, DC.NO.35913-A DT.16.02.95
Specification
DRG.NO.4-025998 DET.NO.025, DC.NO.35913-A DT.16.02.95
Testing / Inspection Facility
|
|
|
|
|
AXLE FIN FOR 125MM HE IN F.C
Description
DRG.NO.4-024610 DET.NO.025 ,DC.NO.35212-A DT.12.11.91
Specification
DRG.NO.4-024610 DET.NO.025 ,DC.NO.35212-A DT.12.11.91
Testing / Inspection Facility
|
|
|
|
|
CAP FOR TAILUNIT 8A IN F.C
Description
DRG.NO.ITV-184,ARDE-1933,DET-13 DC.NO.36852-A DT.23-09-02
Specification
DRG.NO.ITV-184,ARDE-1933,DET-13 DC.NO.36852-A DT.23-09-02
Testing / Inspection Facility
|
|
|
|
|