Items open for Registration

Search

Reset
No Advertisement No. Factory Location Items
53121 ADV_32_114 Ordnance Factory Dehradun The General Manager,
Dehra Dun
Dehra Dun
Uttaranchal
248008
Name Code Quantity Approx Value Select
CAP FOR NITROGEN VALVE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
COLLET GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
EYE PIECE COVER GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RUBBER ARMORING LT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RUBBER ARMORING RT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
INTERPUPILLARY DISTANCE PLATE PRINTED
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
COVER PLATE LT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
COVER PLATE RT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
INSCRIPTION RING GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
HOUSING COMPLETE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RUBBER EYE CUP GREEN COMPLETE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OBJECTIVE CAP LT. GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OBJECTIVE CAP RT. GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OPTIC MOUNT CARRIER LT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OPTIC MOUNT CARRIER RT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RECITAL MOUNT
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
DISTANCE SLEEVE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PRISM APERTURE LEFT
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
EYE PIECE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CAP FOR NITROGEN VALVE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
COLLET GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
EYE PIECE COVER GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RUBBER ARMORING LT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RUBBER ARMORING RT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
INTERPUPILLARY DISTANCE PLATE PRINTED
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
COVER PLATE LT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
COVER PLATE RT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
INSCRIPTION RING GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
HOUSING COMPLETE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RUBBER EYE CUP GREEN COMPLETE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OBJECTIVE CAP LT. GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OBJECTIVE CAP RT. GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OPTIC MOUNT CARRIER LT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OPTIC MOUNT CARRIER RT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RECITAL MOUNT
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
DISTANCE SLEEVE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PRISM APERTURE LEFT
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
EYE PIECE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CAP FOR NITROGEN VALVE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
COLLET GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
EYE PIECE COVER GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RUBBER ARMORING LT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RUBBER ARMORING RT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
INTERPUPILLARY DISTANCE PLATE PRINTED
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
COVER PLATE LT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
COVER PLATE RT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
INSCRIPTION RING GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
HOUSING COMPLETE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RUBBER EYE CUP GREEN COMPLETE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OBJECTIVE CAP LT. GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OBJECTIVE CAP RT. GREEN
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OPTIC MOUNT CARRIER LT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
OPTIC MOUNT CARRIER RT.
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RECITAL MOUNT
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
DISTANCE SLEEVE
Description
As per required Specification
Specification
As per required Specification
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
53122 ADV_880_101 Ammunition Factory Khadki The Cheif General Manager
Kirkee
Kirkee
Maharastra
411003
Name Code Quantity Approx Value Select
COMPONENTS FOR SQUIB PSQ-6 CONSISTING 1) HOUSING 2) CERAMIC BASE 3) SLEEVE
Description
AS PER DGAQA SPECN.
Specification
AS PER DGAQA SPECN.
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SET OF 13 COMPONENTS FOR SUB ASSEMBLY FOR PYROJACK DRG NO. PTA-L-52-01-01-001-X
Description
DRG NO. PTA-L-52-01-01-001-X
Specification
DRG NO. PTA-L-52-01-01-001-X
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
STEEL WASHER TO DRG.NO.ARDE/2165 DET-3 DT 28-9-92. SPECN. ARDE/SPECN/423
Description
ARDE/SPECN/423
Specification
ARDE/SPECN/423
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CASE (C.E.R.U.NO. 204 MK2) TO DRG. NO. ARDE/2165 DETAIL 2 SPECN. ARDE/SPECN/423
Description
ARDE/SPECN/423
Specification
ARDE/SPECN/423
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CABLE CUTTER (MODIFIED) SET OF EMPTIES ASSY DRG. NO. PTA-L-55-01-01-001-A (12 COMPONENTS)
Description
DRG. NO. PTA-L-55-01-01-001-A
Specification
DRG. NO. PTA-L-55-01-01-001-A
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SET OF 5 COMPONENTS FOR EXPLOSIVE BOLT M-10 SPECN:ADE/PTA/PYR SPEC-03
Description
ADE/PTA/PYR SPEC-03
Specification
ADE/PTA/PYR SPEC-03
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
SET OF 13 COMPONENTS FOR SUB ASSEMBLY FOR BAGLINE CUTTER DRG NO. PTA-L-53--01-01-001-X
Description
ADE/PTA/ PYR/SPEC – 02
Specification
ADE/PTA/ PYR/SPEC – 02
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
HEAD TO DRG. NO. ARM/1225 A-3 DT.18.11.2005 SPECN: AIR 304-L
Description
AIR 304-L
Specification
AIR 304-L
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
CONTAINER (MODIFIED) FOR AUGMENTING CHARGE FOR 51 MM BOMB AS PER DRG. NO. ODC/AFK-020-13 SHT. 1 TO 3
Description
DRG. NO. ODC/AFK-020-13 SHT. 1 TO 3
Specification
DRG. NO. ODC/AFK-020-13 SHT. 1 TO 3
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
53123 ADV_395_125 Heavy Vehicle Factory The Sr.General Manager,
Avadi
Avadi
Avadi, Tamil Nadu
600054
Name Code Quantity Approx Value Select
TRACK ASSY to 6206415019
Description
DRG NO.613.44.22 CB-D1 / IGA
Specification
DRG NO.613.44.22 CB-D1/ IGA
Drawing no.
613.44.22 CB-D1/ IGA
Manufacturing Technology
  • ESSENTIAL: 1. Documentary proof of JV/MOU/collaboration agreement 2. Authorization letter from OEM, authorising Indian bidder to submit bid against this RFP. 3. Letter from OEM assuring Technical guidance/ToT and acceptance for certifying the quality of final product being manufactured and supplied by Indian JV/MoU partner. 4. Firm will submit ATP/Quality Plan Document with undertaking that it will submit the final testing protocols and Passports/Certificate of Conformance (COC) with consignment. 5. Plan for progressive indigenization to be submitted along with an undertaking that it is bound to submit documents to prove the indigenisation values as per DDP 2016. 6. Acceptance letter for all TE conditions.
Testing / Inspection Facility
  • ESSENTIAL: 1. Documentary proof of JV/MOU/collaboration agreement 2. Authorization letter from OEM, authorising Indian bidder to submit bid against this RFP. 3. Letter from OEM assuring Technical guidance/ToT and acceptance for certifying the quality of final product being manufactured and supplied by Indian JV/MoU partner. 4. Firm will submit ATP/Quality Plan Document with undertaking that it will submit the final testing protocols and Passports/Certificate of Conformance (COC) with consignment. 5. Plan for progressive indigenization to be submitted along with an undertaking that it is bound to submit documents to prove the indigenisation values as per DDP 2016. 6. Acceptance letter for all TE conditions.
62 Number
53124 ADV_50_133 Ordnance Factory Medak The General Manager
Yeddumailaram, Medak District
Medak
Telangana
502205
Name Code Quantity Approx Value Select
MACHINING OF PRECISION COMPONENTS
Description
As per drawing
Specification
As per drawing
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
TRACK ASSEMBLY
Description
As per drawing
Specification
As per drawing
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
53125 ADV_956_142 Ordnance Factory Dehu Road The Cheif General Manager
Dehu Road
Dehu Road
Maharashtra
412101
Name Code Quantity Approx Value Select
EYE BOLT FOR 120MM ILLG.
Description
DRG.NO.OFDR/FT-464/A4 SPECN.NO. CQA(A) 2321 (b)
Specification
DRG.NO.OFDR/FT-464/A4 SPECN.NO. CQA(A) 2321 (b)
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
RING FOR 120MM ILLG.
Description
DRG. NO. ARDE 2011,DET 24 PART NO.ITV-152 DC (I) 33655-A DATE 12-09-1984 MATL. STEEL TO SPECN. NO.IS: 1570 C 40.
Specification
DRG. NO. ARDE 2011,DET 24 PART NO.ITV-152 DC (I) 33655-A DATE 12-09-1984 MATL. STEEL TO SPECN. NO.IS: 1570 C 40.
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PIN SHEARING 120MM ILLG.
Description
DRG.ARDE 2011,DET 26 PART NO.ITV-138 DC (I) 34861 A MATERIAL MILD STEEL WIRE TO SPECN.IS: 280-1978. REAFFIRMED-2001 AMEND-I.1/4 HARD CONDITION.
Specification
DRG.ARDE 2011,DET 26 PART NO.ITV-138 DC (I) 34861 A MATERIAL MILD STEEL WIRE TO SPECN.IS: 280-1978. REAFFIRMED-2001 AMEND-I.1/4 HARD CONDITION.
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
WASHER COPPER FOR 105 MM ILLG.
Description
DRG.NO. D 6 P-A-180/1/3,PT NO.ISX 344
Specification
DRG.NO. D 6 P-A-180/1/3,PT NO.ISX 344
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PIN SHEARING FOR 105MM ILLG.
Description
DRG.D6P-A-179/1/3 PART NO. ISX 372
Specification
DRG.D6P-A-179/1/3 PART NO. ISX 372
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
DELAY TUBE FOR 51MM ILLG.
Description
DRG. ARDE 2064 (DET. 37) PART NO IQX 898 SPECN.CQA (A) 2328 (d)
Specification
DRG. ARDE 2064 (DET. 37) PART NO IQX 898 SPECN.CQA (A) 2328 (d)
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
PIN LOCKING FOR 51MM ILLG.
Description
DRG.NO. ARDE-2064 DET NO 31 PT.NO. ITV 243 SPECN.CQA(A) 2328 (d)
Specification
DRG.NO. ARDE-2064 DET NO 31 PT.NO. ITV 243 SPECN.CQA(A) 2328 (d)
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
TIN ZINC WASHER 21.08 FOR 1G/ILLU
Description
WASHER STAR (80/20 TIN ZINC ALLOY): O.D. 21.08 0.13MM; I.D. 6.35; THICKNESS 0.51MM.DRG.NO.DD(L)15976 PART NO.QW 7AFDC 36996-A ITEM NO.2
Specification
WASHER STAR (80/20 TIN ZINC ALLOY): O.D. 21.08 0.13MM; I.D. 6.35; THICKNESS 0.51MM.DRG.NO.DD(L)15976 PART NO.QW 7AFDC 36996-A ITEM NO.2
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
TIN ZINC WASHER 12.7O D FOR 16 MM
Description
WASHER(80/20 TIN ZINC ALLOY) O.D.12.7 MM ,I.D.9.52 MM AND THICKNESS 0.508 MM.
Specification
WASHER(80/20 TIN ZINC ALLOY) O.D.12.7 MM ,I.D.9.52 MM AND THICKNESS 0.508 MM.
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
BODY & BOTTOM FOR FOG SIGNAL
Description
DRG. NO. OFDR/FOG SIGNAL/37/A1 AMDT NO. 185 DT. 24/5/2011
Specification
DRG. NO. OFDR/FOG SIGNAL/37/A1 AMDT NO. 185 DT. 24/5/2011
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
WASHER (BRASS) FOR 120MM ILLG.
Description
WASHER (BRASS) FOR FUZE T&P DA NO 213 P MK5 (M2)(FILLED)DRG.NO. S5/7806/F/621 PART NO QX 1247
Specification
WASHER (BRASS) FOR FUZE T&P DA NO 213 P MK5 (M2)(FILLED)DRG.NO. S5/7806/F/621 PART NO QX 1247
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
FERRULE FOR 120MM ILLG.
Description
DRG. NO. ARDE 2097 PT NO ITV - 217
Specification
DRG. NO. ARDE 2097 PT NO ITV - 217
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
COLLAR FOR 120MM ILLG.
Description
DRG.NO.ARDE 2011 DET 8 PT NO.ITV - 158 DC (I) 36931 (A) DT.14.11.03. MATERIAL SPECN.IS 1570C-20 SPECN.NO. CQA (A) 2321 (b)
Specification
DRG.NO.ARDE 2011 DET 8 PT NO.ITV - 158 DC (I) 36931 (A) DT.14.11.03. MATERIAL SPECN.IS 1570C-20 SPECN.NO. CQA (A) 2321 (b)
Drawing no.
Manufacturing Technology
Testing / Inspection Facility
Proceed