| Name |
Code |
Quantity |
Approx Value |
Select |
PRECISION MACHINING OF COMPONENTS AND SUB ASSEMBLIES
Description
As per drawing
Specification
As per drawing
Testing / Inspection Facility
|
|
|
|
|
MACHINED COMPONENTS AND SPECIAL TYPE OF INDUSTRIAL FASTENERS
Description
As per drawing
Specification
As per drawing
Testing / Inspection Facility
|
|
|
|
|
LIGHT FABRICATION WORK
Testing / Inspection Facility
|
|
|
|
|
FORGINGS
Testing / Inspection Facility
|
|
|
|
|
PRECISION ENGINEERING AND FABRICATION WORKS
Description
As per drawing
Specification
As per drawing
Testing / Inspection Facility
|
|
|
|
|
MANUFACTURING AND MAINTENANCE OF HYDRULIC CYLINDERS, TEST RIGS AND POWER PACKS etc.,
Testing / Inspection Facility
|
|
|
|
|
CASTINGS OF FERROUS AND NON FERROUS ALLOYS
Description
As per drawing
Specification
As per drawing
Testing / Inspection Facility
|
|
|
|
|
GRAVITY DIE CASTINGS AND LIGHT MACHINING WORKS
Testing / Inspection Facility
|
|
|
|
|
PRECISION MACHINING OF COMPONENTS
Description
As per drawing
Specification
As per drawing
Testing / Inspection Facility
|
|
|
|
|
FORGED COMPONENTS WITH MACHINING
Testing / Inspection Facility
|
|
|
|
|
SHEET METAL FABRICATION AND RELATED WORKS
Testing / Inspection Facility
|
|
|
|
|
ALL TYPES OF MEDIUM AND PRECISION MACHINING WORKS
Description
As per drawing
Specification
As per drawing
Testing / Inspection Facility
|
|
|
|
|
MANUFACTURERS OF METALIC AND NON METALIC ITEMS
Testing / Inspection Facility
|
|
|
|
|
Water Separator F7856800
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
De-Aeration Tank X1006700
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
Half XL Ft.& RR Stallion
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
Air Chamber/Brake Chamber Foot, Tailor & Exhaust Brake Assy. Spring Brake Actuator
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
Kapok Indian (Semul) (Gr.-2 & Gr.-3) various
Description
AS PER REQUIREMENT & SPECIFICATION
Specification
AS PER REQUIREMENT & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
CATERING CONTRACT
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
BUILDING MATERIAL
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
HARDWARE
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
BUILDING MATERIAL
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
SHAMIYANA FOR OFFICIAL FUNCTION
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
UNLOADING & STACKING OF ALL KIND OF DEFENCE MATERIAL
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
DEPRIMING OF BRASS SCRAP
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
SHIFTING OF MATERIAL
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
HARDCHROME PLATING
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
PLYWOOD
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
BLOCK BOARD
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
PACKING CASES
Description
AS PER DRAWING/REQUIREMENT
Specification
AS PER DRAWING/REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
TIMBER PLANK
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
d) Rear Towing Hook for LPTA,e) Assy.Engine Cross Member for LPTA,f) 5th Cross Member for LPTA etc.
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
1) Engine Cross Member for LPTA, 2) Tail Lamp Bkt.of LPTA, 3) 6th Cross Member for LPTA,
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
4) 5th Cross Member for LPTA, 5) Reinforcement LH/RH, 6) Assy.Floor Structure for LPTA,
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
7) Assy.Load Body for LPTA, 8) Assy.Cross Tube, 9) Rear Towing Hook for LPTA,
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
10) Assy.Cross Member without Air Filter Mtg.Bkt., 11) Assy.S/A Cross Member Rear etc.
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
1) Assy.Taillamp Bkt., 2) Assy.Engine Cross Member for LPTA, 3) STH Cross Member for LPTA,
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
4) 6TH Cross Member for LPTA, 5) Reinforcement LH&RH for LPTA, 6) Assy. Spacer Block etc.
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|