| 85601 |
ADV_44_113 |
Ordnance Factory Khamaria
|
The Cheif General Manager
Khamaria
Khamaria
Madhya Pradesh
482005
|
| Name |
Code |
Quantity |
Approx Value |
Select |
BALL INSERT FRONT & REAR
Description
F1301-910840C F1301-902230C DRG.NO. F1301-155180C F1301-036770C
Specification
F1301-910840C F1301-902230C DRG.NO. F1301-155180C F1301-036770C
Testing / Inspection Facility
|
|
|
|
|
TIMBER BIZASAL INDIAN 25X152MMX2.4M
Description
SPECN. IND/GS-754 (K)
Specification
SPECN. IND/GS-754 (K)
Testing / Inspection Facility
|
|
|
|
|
BOX W-131 MK-3/L WOODEN
Description
IA-948(a,k) DRG. NO. ISV-162-A
Specification
IA-948(a,k) DRG. NO. ISV-162-A
Testing / Inspection Facility
|
|
|
|
|
SET OF 3 SECONDARY COMPT.
Description
DRG.NO. IS-412, 413
Specification
DRG.NO. IS-412, 413
Testing / Inspection Facility
|
|
|
|
|
SET OF 4 PRIMARY COMP-125MM FSAPDS
Description
AS PER SPECIFIED SPCN. & DRG.
Specification
AS PER SPECIFIED SPCN. & DRG.
Testing / Inspection Facility
|
|
|
|
|
|
| 85602 |
ADV_147_111 |
Ordnance Factory Ambernath
|
The Sr.General Manager,
Ambarnath
Ambarnath
Maharashtra
421502
|
| Name |
Code |
Quantity |
Approx Value |
Select |
POLYTHENE BAG RW142
Description
POLYTHENE PROTECTIVE BAG FOR PACKING OF CARTG CASE 105 MM IFG.
Specification
JSS;9330-03-2014 REV NO.3, L.D.P.E GRADE TYPE 1.
Drawing no.
OFA DRG.NO.RW142/SK/0801/C DT.24.02.2004 AMENDED UPTO 10/02/16.
Testing / Inspection Facility
|
25 |
Number |
|
|
POLYTHENE BAGS
Description
AS PER IS/BIS/DRAWING/REQUIREMENT
Specification
AS PER IS/BIS/DRAWING/REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
|
| 85603 |
ADV_50_133 |
Ordnance Factory Medak
|
The General Manager
Yeddumailaram, Medak District
Medak
Telangana
502205
|
|
| 85604 |
ADV_903_131 |
Vehicle Factory Jabalpur
|
The Sr.General Manager,
Jabalpore
Jabalpore
Madhya Pradesh
482009
|
|
| 85605 |
ADV_106_102 |
Ordnance Equipment Factory
|
The General Manager,
Kanpur
Kanpur
Kanpur, Uttar Pradesh
208001
|
| Name |
Code |
Quantity |
Approx Value |
Select |
Kapok Indian (Semul) (Gr.-2 & Gr.-3) various
Description
AS PER REQUIREMENT & SPECIFICATION
Specification
AS PER REQUIREMENT & SPECIFICATION
Testing / Inspection Facility
|
|
|
|
|
CATERING CONTRACT
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
BUILDING MATERIAL
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
HARDWARE
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
BUILDING MATERIAL
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
SHAMIYANA FOR OFFICIAL FUNCTION
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
UNLOADING & STACKING OF ALL KIND OF DEFENCE MATERIAL
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
DEPRIMING OF BRASS SCRAP
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
SHIFTING OF MATERIAL
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
HARDCHROME PLATING
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
PLYWOOD
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
BLOCK BOARD
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
PACKING CASES
Description
AS PER DRAWING/REQUIREMENT
Specification
AS PER DRAWING/REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
TIMBER PLANK
Description
AS PER REQUIREMENT
Specification
AS PER REQUIREMENT
Testing / Inspection Facility
|
|
|
|
|
d) Rear Towing Hook for LPTA,e) Assy.Engine Cross Member for LPTA,f) 5th Cross Member for LPTA etc.
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
1) Engine Cross Member for LPTA, 2) Tail Lamp Bkt.of LPTA, 3) 6th Cross Member for LPTA,
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
4) 5th Cross Member for LPTA, 5) Reinforcement LH/RH, 6) Assy.Floor Structure for LPTA,
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
7) Assy.Load Body for LPTA, 8) Assy.Cross Tube, 9) Rear Towing Hook for LPTA,
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
10) Assy.Cross Member without Air Filter Mtg.Bkt., 11) Assy.S/A Cross Member Rear etc.
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
1) Assy.Taillamp Bkt., 2) Assy.Engine Cross Member for LPTA, 3) STH Cross Member for LPTA,
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
4) 6TH Cross Member for LPTA, 5) Reinforcement LH&RH for LPTA, 6) Assy. Spacer Block etc.
Description
As per Component Drg.
Specification
As per Component Drg.
Testing / Inspection Facility
|
|
|
|
|
|
| 85606 |
ADV_475_104 |
Gun Carriage Factory
|
The General Manager,
Jabalpur
Jabalpur
Jabalpur,Madhya Pradesh
482011
|
|
| 85607 |
ADV_395_125 |
Heavy Vehicle Factory
|
The Sr.General Manager,
Avadi
Avadi
Avadi, Tamil Nadu
600054
|
|
| 85608 |
ADV_453_115 |
Ordnance Factory Muradnagar
|
The General Manager,
Muradnagar
Muradnagar
Uttar Pradesh
201206
|
|
| 85609 |
ADV_837_140 |
Ordnance Factory Itarsi
|
The Cheif General Manager
Itarsi
Itarsi
Madhya Pradesh
461122
|
| Name |
Code |
Quantity |
Approx Value |
Select |
Sodium Sulphate Anhydrous Tech Gr. A
Description
OFI/0015/SPN Dtd. 17.06.1994
Specification
OFI/0015/SPN Dtd. 17.06.1994
Testing / Inspection Facility
|
|
|
|
|
|
| 85610 |
ADV_619_128 |
Ordnance Factory Tiruchirapalli
|
The General Manager,
Tiruchirapalli
Tiruchirapalli
Tamil Nadu
620016
|
|
|