| Name |
Code |
Quantity |
Approx Value |
Select |
ALUMINIUM FRAME COMPLETE PURE EPOXY POWDER COATED BLACK TO MINIMUM 50 MICRON (.05MM) FITTED WITH STRAPS RETAINERS(EYE)
Description
PROV.IND/TC/1550 (7202/PK DT.21.09.13)
Specification
PROV.IND/TC/1550 (7202/PK DT.21.09.13)
Testing / Inspection Facility
|
|
|
|
|
TWISTED PINS
Description
PROV.SPECN.NO.DMSRDE/ES&S/2008/231 ISSUED ON 19/05/2015
Specification
PROV.SPECN.NO.DMSRDE/ES&S/2008/231 ISSUED ON 19/05/2015
Testing / Inspection Facility
|
|
|
|
|
THREE WAY ROOF POLE MILD STEEL JOINT
Description
PROV.SPECN.NO.DMSRDE/ES&S/2008/231 ISSUED ON 19/05/2015
Specification
PROV.SPECN.NO.DMSRDE/ES&S/2008/231 ISSUED ON 19/05/2015
Testing / Inspection Facility
|
|
|
|
|
THREE WAY MILD STEEL JOINT WITH BASE PLATE
Description
PROV.SPECN.NO.DMSRDE/ES&S/2008/231 ISSUED ON 19/05/2015
Specification
PROV.SPECN.NO.DMSRDE/ES&S/2008/231 ISSUED ON 19/05/2015
Testing / Inspection Facility
|
|
|
|
|
FOUR WAY MILD STEEL JOINT
Description
PROV.SPECN.NO.DMSRDE/ES&S/2008/231 ISSUED ON 19/05/2015
Specification
PROV.SPECN.NO.DMSRDE/ES&S/2008/231 ISSUED ON 19/05/2015
Testing / Inspection Facility
|
|
|
|
|
Plate for Hinge H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Plate Engaging H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Catch C44A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Bottom Frame 13A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Top Frame 13A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Plate for Hinge H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Handle H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Catch C44A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Top Frame 13A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Vertical Channel 6 AL
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Catch 6 AL
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Rubber Stud 13A
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Rubber Gasket H2A
Description
As per Drg & specification
Specification
As per Drg & specification
Testing / Inspection Facility
|
|
|
|
|
Rubber Stud 13A
Description
As per Drg & specification
Specification
As per Drg & specification
Testing / Inspection Facility
|
|
|
|
|
Catch H5A
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Hinge & Hinge Pin H2A
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Catch H2A
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Handle H2A
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Assy. Handle C43A
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Carrying Link C43A
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Catch C44A
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Vertical Channel 13A
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Botom Frame 13A
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Top Frame 13A
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Vertical Channel 6 AL
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Name Plate 6 AL
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Catch 6 AL
Description
As per Drg. & specification
Specification
As per Drg. & specification
Testing / Inspection Facility
|
|
|
|
|
Catch H5A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Hinge & Hinge Pin H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Plate for Hinge H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Catch H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Handle H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Plate Engaging H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Bottom Frame 13A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Vertical Channel 6AL
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Catch H5A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Hinge & Hinge Pin H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Plate for Hinge H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Catch H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Handle H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Plate Engaging H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Bottom Frame 13A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Top Frame 13A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Vertical Channel 6AL
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Bottom Frame 13A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Top Frame 13A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Vertical Channel 6AL
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Catch H5A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Plate for Hinge H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|
Catch H2A
Description
As per Drg. & Specification
Specification
As per Drg. & Specification
Testing / Inspection Facility
|
|
|
|
|