FABRICATION OF SOCKS MEN'S WOOL DARK OG
Specification:- Fabrication (Knitting, Linking, Asst. to Linking, Washing, Pressing, Checking and Darning) of Socks Men’s Wool Dark OG, As per Specification no. PROV/OCFS/SOCKS/ARMY/NEW 64(a) & ANNEXURE-“A1”
Specification
FABRICATION OF SOCKS MEN'S WOOL DARK OG
Specification:- Fabrication (Knitting, Linking, Asst. to Linking, Washing, Pressing, Checking and Darning) of Socks Men’s Wool Dark OG, As per Specification no. PROV/OCFS/SOCKS/ARMY/NEW 64(a) & ANNEXURE-“A1”
Drawing no.
Manufacturing Technology
as per attached list (Manufacturing Technology Files )
BOOSTER SUB ASSEMBLY WITH SET BACK MECHANISM TO CQA(A) DRG. NO.13021-0-0.DC(I). NO.35218-A DT.13-11-91. WITH CUP BOOSTER TO CQA(A) DRG.NO.13032-0-0.DC(I). NO.36804-A DT.1-1-02.SPECN. NO. MIL-F-46996 B(MU),AIDEMEMOIRE B/14 AND CQA(A)PROOF SCHEDULE NO. CQA (A)/PS/FZ/120/5 (PROVISIONAL)
Specification
BOOSTER SUB ASSEMBLY WITH SET BACK MECHANISM TO CQA(A) DRG. NO.13021-0-0.DC(I). NO.35218-A DT.13-11-91. WITH CUP BOOSTER TO CQA(A) DRG.NO.13032-0-0.DC(I). NO.36804-A DT.1-1-02.SPECN. NO. MIL-F-46996 B(MU),AIDEMEMOIRE B/14 AND CQA(A)PROOF SCHEDULE NO. CQA (A)/PS/FZ/120/5 (PROVISIONAL)
Drawing no.
BOOSTER SUB ASSEMBLY WITH SET BACK MECHANISM TO CQA(A) DRG. NO.13021-0-0.DC(I). NO.35218-A DT.13-11-91
Firm must be manufacturer only.
a.The firm must have vertical milling centre (VMC) as an important facility in house with them, Detailed to be attached in technical bid.
b.The firm must have manufacture the similar type of component in past (03) three years. Copies of Supply Order executed for similar type of item (such as Engineering and Automobile application cItem :sharing cutter, Blade/ form sheets for assembly of parts) to be enclosed with technical Bid
c.firm must submit detailed Quality Assurance Plan (QAP) for manufacturing of tendered item.
d.Firm must have inspection & testing facility in-house or out sourced with Govt. Approved /NABL certified Laboratory Details to be attached with technical bid.
e.Firm must attached details of Out sourced facilities for manufacture process of tendered item. Credentials ( including manufacturing facilities of out sourced from to be furnished.