Snap Fastener Top 7/7 & Bottom 7/7 in Four Parts (Cap of Top Covered with Dark Brown Sheeting)
Specification:- IS:4741-1968 (reaffirmed 2008) Unit – set contains 10 set Snap fastener 7/7 bottom in two parts and 12 set Snap fastener 7/7 Top in two parts are equal to 01 set
Specification
Snap Fastener Top 7/7 & Bottom 7/7 in Four Parts (Cap of Top Covered with Dark Brown Sheeting)
Specification:- IS:4741-1968 (reaffirmed 2008) Unit – set contains 10 set Snap fastener 7/7 bottom in two parts and 12 set Snap fastener 7/7 Top in two parts are equal to 01 set
Drawing no.
Manufacturing Technology
as per attached list (Manufacturing Technology Files )
Electrical Control Panel Complete with Accessories as per Annexure A QTY 1 No
Specification
Electrical Control Panel Complete with Accessories as per Annexure A QTY 1 No
Drawing no.
Manufacturing Technology
a) Loading of Components:- The panel of components including flat parts ( Doors, Rear Panels, Top & Bottom Covers, Gland Plates and Side Panels etc) . Compact Enclosures are loaded at this stage .
b) Pre Treatment- Stage I:- In this zone, all the oil grease and foreign impurities are cleaned.
c) Pre Treatment- Stage II:- This is done in different stages using water jets, which flush down all chemicals from stage I on the surface or the edges.
d) Pre treatment StageIII :- This is done in different stages using fresh DM water jets, which flush down all chemicals from stage II on the surface of edges.
e) Pretreatment stage IV- Here the panes are uniformly coated with a special Nano-ceramic coating bone rite NT-1 ( replacing the commonly used phosphating process) applied by high pressure jets.
f) Pre Treatment Stage V- This is done in different stages using water jets, which flush down all dissolved salts on the surface of the edges.
g) Pretreatment –Stage VI- In this final pre treatment
Chemical & Mechanical properties as per std. given drawing /Specification.
2) Dimensional inspection for all dimension given in the drawing & other parameter which are mentioned in relevant drawing/specification
PHOTO DIODE LFD-2(LFD-2A)
Drg No.ET3.368.003TY(ET3.368.003-01TY
PHOTO DIODE LFD-2(LFD-2A) AS P
ER SPECN.ET3.368.003TY
(ET3.368.003-01TY)WITH DARK CU
RRENT < 1 MICRO AMPIER AT
REVERSE BIAS VOLTAGE 8 +/- 1V
Specification
PHOTO DIODE LFD-2(LFD-2A)
Drg No.ET3.368.003TY(ET3.368.003-01TY
PHOTO DIODE LFD-2(LFD-2A) AS P
ER SPECN.ET3.368.003TY
(ET3.368.003-01TY)WITH DARK CU
RRENT < 1 MICRO AMPIER AT
REVERSE BIAS VOLTAGE 8 +/- 1V
Drawing no.
PHOTO DIODE LFD-2(LFD-2A) Drg No.ET3.368.003TY(ET3.368.003-01TY PHOTO DIODE LFD-2(LFD-2A) AS P ER SPECN.ET3.368.003TY (ET3.368.003-01TY)WITH DARK CU RRENT < 1 MICRO AMPIER AT REVERSE BIAS VOLTAGE 8 +/- 1V
Manufacturing Technology
ELECTRONIC ITEMS
Testing / Inspection Facility
ELECTRONIC ITEMS
90
533
Number
6249
O113-19
Ordnance Factory Dehradun
The General Manager,
Dehra Dun
Dehra Dun
Uttaranchal
248008
"Firm Should have the following in-house facility or arrange from outside and necessary tie up letter to be submitted.
i.e. Firm should have Chemical, Metallurgical & Mechanical testing Laboratory or tie up with other firms for the same."
"Firm Should have the following in-house facility or arrange from outside and necessary tie up letter to be submitted.
i.e. Firm should have Galvanizing & Chromatizing Facility or tie up with other firms for the same."
"Firm should have the following in-house manufacturing facilities for manufacturing of the item.
Milling Machine (Essential Criteria)"
"Firm should have the following in-house manufacturing facilities for manufacturing of the item.
Lathe Machine (Essential Criteria)"
"Firm should have the following in-house manufacturing facilities for manufacturing of the item.
Forging Facility-Open Die forging 500 Ton minimum capacity (Essential Criteria)"
"Firm Should have the following in-house facility or arrange from outside and necessary tie up letter to be submitted.
i.e. Firm should have Chemical, Metallurgical & Mechanical testing Laboratory or tie up with other firms for the same."
"Firm Should have the following in-house facility or arrange from outside and necessary tie up letter to be submitted.
i.e. Firm should have Galvanizing & Chromatizing Facility or tie up with other firms for the same."